Flightpath 24 November 2024

The Riyadh Metro opens: 176 km, six lines, and a link to KKIA

🇸🇦 The need for a comprehensive public transit system in Riyadh, especially one connecting key nodes like King Khalid International Airport has been significant. Launching this week, the Riyadh Metro will address this gap by providing an affordable, efficient, and convenient connection to the airport.

Highlights

Total Length: 176 km
Number of Lines: 6
Stations: 84
Estimated Cost: $22.5 billion
Initial Capacity: 1.2 million pax per day
Future Capacity: Up to 3.6 million pax daily

Lines and Routes
Line 1 (Blue Line): Runs north to south along Olaya and Batha streets
Line 2 (Red Line): Traverses east to west along King Abdullah Road
Line 3 (Orange Line): Extends along Al-Madinah Al-Munawwarah Road
Line 4 (Yellow Line): Connects King Khalid International Airport to the city
Line 5 (Green Line): Runs along King Abdulaziz Road
Line 6 (Purple Line): Serves the eastern districts

Image credits to respective owners

(This write-up is for educational/informational purposes only)

(Views my own; happy to amend inaccuracies, if any)

Graphic from The Riyadh Metro opens: 176 km, six lines, and a link to KKIA
Graphic from The Riyadh Metro opens: 176 km, six lines, and a link to KKIA

First published on LinkedIn, see the original.All writing →